Regional flood-risk map for The Mississippi, Ohio & Missouri River Valleys
Regional Guide · Tier 3

The river has a 100-year flood map.It updates every spring.

River-valley flooding is the most-predicted, least-prepared-for flood threat in America. Forecasts arrive 5 to 10 days in advance. Crest dates are known to the hour. Levee overtopping is modeled to the foot. And every spring, hundreds of garages along the Mississippi, Ohio and Missouri river basins flood anyway — because there is no good way to move a collector vehicle to higher ground, and the alternative has always been to lose it.

River crest flooding · Levee failure · Stalled MCS rainfall

$20B
1993 Great Flood — Mississippi & Missouri basins
48 ft
All-time crest — St. Louis, 1993
10 days
Typical river-crest forecast lead time
13
States in the Mississippi River basin flood zone

Sources: NOAA National Hurricane Center · NOAA NCEI Billion-Dollar Weather and Climate Disasters · National Weather Service. Figures reflect published agency totals; rounded where noted.

High-risk regions of the river valleys — and what's stored there.

St. Louis / Mississippi Confluence

Confluence of the Mississippi and Missouri. Heavy classic American iron and pre-war restoration projects.

Memphis / Mississippi Delta

Lower Mississippi crest exposure. Concentration of restored muscle cars and inherited family vehicles.

Quad Cities / Upper Mississippi

Annual spring crest events. Riverfront garages with predictable but unstoppable inundation.

Louisville / Ohio River

Ohio River basin flooding. Heavy classic American truck and muscle ownership.

Cincinnati / Tri-State

Ohio River crest events. Concours-grade collections in Indian Hill and the Kentucky horse country.

Kansas City / Missouri Basin

Missouri River basin plus stalled MCS rainfall events. Restored American iron and inherited collections.

Pre-Event Protocol

The river-valley protocol.

You will have days of warning. Use them.

  1. Crest -10 day
    Monitor NWS river forecasts. Confirm vault is on-site and inspected.
  2. Crest -5 day
    Open and inspect. Confirm zipper track. Verify deployment path is clear.
  3. Crest -2 day
    Deploy. Seal the vault while conditions are dry.
  4. Crest -0
    Vehicle is sealed. Plan for one to three weeks of standing-water exposure.

The river told you it was coming. Now you have an answer.

Find my vault